01
Installation Steps
The installation process follows a precise sequence to guarantee structural integrity:
- Ground preparation: Ensuring a flat, stable base (decking, concrete, or stone)
- Steel frame assembly: Mounting the carrier arches and connecting rings
- Polycarbonate mounting: Placing and sealing the 2 mm solid sheets
- Door and window installation: Fixing the lockable door and shock-absorber windows
- Sealing and testing: Applying weatherproofing and checking airflow
